Today saw the footings (or at least most of them) filled with concrete. A lot of concrete.
The patio and path to the shed are also taking shape.
Whilst the power cable has been repaired, we are still without a telephone line and hence broadband. Apparently OpenReach will come and fix it sometime in the next 3 to 5 days.