Day 45 : More Steel

Posted on Wed 30 Oct 2019 by Alvin Finn

Nearly all if the steelwork is now in and the brickies are just finishing the facing bricks around the steel posts. It’s good to finally see the building out of the ground!

Read More

Day 44 : Steel

Posted on Tue 29 Oct 2019 by Alvin Finn

A very exciting day today as the first of the steels are erected.

Read More

Day 38 : Big Lorry

Posted on Wed 23 Oct 2019 by Alvin Finn

Today the walls and roof arrived on the back of a rather large lorry. The driver had fun getting it down our lane.

Read More

Day 36 : Roof?

Posted on Tue 22 Oct 2019 by Alvin Finn

Today the roof tiles were stripped Back. Please don’t rain… And a bit if tidying up at the back ready for landscaping.

Read More

Day 34 : Drains

Posted on Sat 19 Oct 2019 by Alvin Finn

Drains are all ready for the slab.

Read More

Day 33 : Fencing

Posted on Fri 18 Oct 2019 by Alvin Finn

I spent a large part of the day fitting gravel boards and the frame for the new fence. Horizontal slats will be fitted eventually. It may take a while though as I need to paint them before I fit them and it’s too cold and wet to do that outside. I will miss the sheep…

Read More

Day 32 : Getting There

Posted on Fri 18 Oct 2019 by Alvin Finn

The groundworks are finally approaching their end. Today, the hardcore under the structural slab was flattened, the concrete pads for the steelwork finished and there was a bit of a tidy up.

Read More

Day 31 : Bits & Pieces

Posted on Wed 16 Oct 2019 by Alvin Finn

Progress on various bits and pieces. The wet weather has not helped.

Read More

Day 24 : Why No Posts?

Posted on Wed 09 Oct 2019 by Alvin Finn

It’s been a few days since I have posted, but things have been moving. Today, some more brick and blocks went in. Over the last few days, work has continued on the drainage. The rear soak away has been connected to the pipework for the ACO drain and guttering.

Read More

Day 17 : Drains and Fences (again)

Posted on Wed 02 Oct 2019 by Alvin Finn

More work on the drains. Gravel boards installed on the fence posts. And BT have fixed the telephone line again.

Read More
  • 1
  • 2
  • Next

Recent Posts

  • Day 281
  • Day 193 / Isolation Day 6
  • Day 150 : Loads Going On
  • Day 129 : We have Screed!
  • Day 128 : Underfloor Heating

Recent Comments

    Archives

    • June 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    ©2026 The West Wing | Powered by WordPress & Superb Themes

    We are using cookies to give you the best experience on our website.

    You can find out more about which cookies we are using or switch them off in .

    The West Wing
    Powered by  GDPR Cookie Compliance
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

    Strictly Necessary Cookies

    Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.