Author: Alvin Finn

Day 281

Posted on Mon 22 Jun 2020 by Alvin Finn

Things have been moving rather slowly since the last update. Lockdown has proved not be be a great time for building an extension.

Read More

Day 193 / Isolation Day 6

Posted on Thu 26 Mar 2020 by Alvin Finn

There has been activity since my last update, but with the world being the way it is things will slow down for a while. Out new veranda. Lots of bits move; you probably do not appreciate it on a photo. As I have a bit more time on my hands, perhaps I should post some…

Read More

Day 150 : Loads Going On

Posted on Wed 12 Feb 2020 by Alvin Finn

The render is on and the scaffold is gone! Work is progressing on the inside.

Read More

Day 129 : We have Screed!

Posted on Wed 22 Jan 2020 by Alvin Finn
Read More

Day 128 : Underfloor Heating

Posted on Tue 21 Jan 2020 by Alvin Finn

Underfloor heating pipes and manifold are in! Ready for the screed tomorrow.

Read More

Day 126 : Catch Up

Posted on Sun 19 Jan 2020 by Alvin Finn

It appears that I have not been great at providing updates of late. With Christmas, things have been a bit slow, but should now pickup.

Read More

Day 99 : More Glass

Posted on Wed 25 Dec 2019 by Alvin Finn

And the answer is no, we will not be watertight for Christmas! We are almost there. The sliding doors and “big” window are in.

Read More

Day 96 : Windows

Posted on Fri 20 Dec 2019Fri 20 Dec 2019 by Alvin Finn

A very exciting day today as the first of the windows and doors are being fitted. Will we be watertight for Christmas?

Read More

Day 95 : Render Boards

Posted on Fri 20 Dec 2019 by Alvin Finn

Most of the render boards are now in.

Read More

Day 83 : Inside

Posted on Sat 07 Dec 2019 by Alvin Finn

Now the building is (sort if) watertight, work can start on the inside. Not much has been done yet, but I have put in a temporary power supply and temporary lights.

Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • Next

Recent Posts

  • Day 281
  • Day 193 / Isolation Day 6
  • Day 150 : Loads Going On
  • Day 129 : We have Screed!
  • Day 128 : Underfloor Heating

Recent Comments

    Archives

    • June 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    ©2026 The West Wing | Powered by WordPress & Superb Themes

    We are using cookies to give you the best experience on our website.

    You can find out more about which cookies we are using or switch them off in .

    The West Wing
    Powered by  GDPR Cookie Compliance
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

    Strictly Necessary Cookies

    Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.