The day started well, with work on digging the footings continuing. Things took a turn for the worse when the digger cut through the BT cable and slit part of the power cable to the house.
The day started well, with work on digging the footings continuing. Things took a turn for the worse when the digger cut through the BT cable and slit part of the power cable to the house.