Nearly all if the steelwork is now in and the brickies are just finishing the facing bricks around the steel posts. It’s good to finally see the building out of the ground!
Read MoreMonth: October 2019
Day 44 : Steel
A very exciting day today as the first of the steels are erected.
Read MoreDay 38 : Big Lorry
Today the walls and roof arrived on the back of a rather large lorry. The driver had fun getting it down our lane.
Read MoreDay 36 : Roof?
Today the roof tiles were stripped Back. Please don’t rain… And a bit if tidying up at the back ready for landscaping.
Read MoreDay 34 : Drains
Drains are all ready for the slab.
Read MoreDay 33 : Fencing
I spent a large part of the day fitting gravel boards and the frame for the new fence. Horizontal slats will be fitted eventually. It may take a while though as I need to paint them before I fit them and it’s too cold and wet to do that outside. I will miss the sheep…
Read MoreDay 32 : Getting There
The groundworks are finally approaching their end. Today, the hardcore under the structural slab was flattened, the concrete pads for the steelwork finished and there was a bit of a tidy up.
Read MoreDay 31 : Bits & Pieces
Progress on various bits and pieces. The wet weather has not helped.
Read MoreDay 24 : Why No Posts?
It’s been a few days since I have posted, but things have been moving. Today, some more brick and blocks went in. Over the last few days, work has continued on the drainage. The rear soak away has been connected to the pipework for the ACO drain and guttering.
Read MoreDay 17 : Drains and Fences (again)
More work on the drains. Gravel boards installed on the fence posts. And BT have fixed the telephone line again.
Read More