Most of the soleplate and DPC is in place. And the pool is filling up slowly but surely.
Read MoreMonth: November 2019
Day 50 : Slab or Swimming pool?
The Slab went in today. Looking good, if a little wet. “Light Showers” the forecast said!
Read MoreDay 47 : Slab Prep
The sand, DPM and most if the steel mesh are in place ready for the concrete slab to be poured. A pity about the heavy rain forecast for tomorrow.
Read More