I appear to be building a set of indoor rugby posts! Plenty of progress with the ground floor walls today.
Read MoreDay 52 : Walls
A special day today as the first piece of wall is up!
Read MoreDay 51 : Soleplate
Most of the soleplate and DPC is in place. And the pool is filling up slowly but surely.
Read MoreDay 50 : Slab or Swimming pool?
The Slab went in today. Looking good, if a little wet. “Light Showers” the forecast said!
Read MoreDay 47 : Slab Prep
The sand, DPM and most if the steel mesh are in place ready for the concrete slab to be poured. A pity about the heavy rain forecast for tomorrow.
Read MoreDay 45 : More Steel
Nearly all if the steelwork is now in and the brickies are just finishing the facing bricks around the steel posts. It’s good to finally see the building out of the ground!
Read MoreDay 44 : Steel
A very exciting day today as the first of the steels are erected.
Read MoreDay 38 : Big Lorry
Today the walls and roof arrived on the back of a rather large lorry. The driver had fun getting it down our lane.
Read MoreDay 36 : Roof?
Today the roof tiles were stripped Back. Please don’t rain… And a bit if tidying up at the back ready for landscaping.
Read MoreDay 34 : Drains
Drains are all ready for the slab.
Read More